APT Visit Planner Top Level Requirements and Glossary
June 18th, 2001
Requirements
- Indicate the times when visits can or cannot be scheduled.
- Indicate the reasons that a visit cannot schedule at a particular
time.
- Provide direct access to editors within APT to change visits and the
relationships between visits to modify schedulability.
- Provide general advice on techniques to obtain desired
schedulability.
- Provide analysis of how particular visits might be modified to
improve their schedulability or to obtain schedulability for
particular dates.
Glossary
- Link:
A relationship among 2 or more visits.
- Observer Requirements:
The
requirements which observers place on observations to meet
science goals.
- Observatory Restrictions:
The
restrictions which an observatory places on observations
as a matter of policy or physical limitations
- Observation Constraint:
An
Observer Requirement or Observatory Restriction that
constrains the circumstances under which a visit may be
scheduled.
- Scheduling Constraint:
Any Observation
Constraint or combination of Observation Constraints that
affects when a visit can or cannot schedule.
- Scheduling Windows:
The periods
of time that a visit can or cannot schedule due to scheduling
constraints.
- Total Scheduling Windows:
A set of scheduling
windows that accounts for all scheduling constraints.
- Partial Scheduling Windows:
A set of scheduling
windows that takes into account a subset of scheduling
constraints..
- Schedulable/Unschedulable Window:
A period of time
over which a visit can or cannot schedule.
- Visit:
Any grouping of observations which can be
scheduled as a unit.