50:
Show-Stopper for Cycle 12 (3/18/03)
100 - 199: Needed for Cycle 12 (3/18/03)
200 - 299: Desired for Cycle 12 (3/18/03)
300 - 399: On Hold for Testing or Developer Input
400 - 499: Needed beyond Cycle 12
500 - 599: Desired beyond Cycle 12
900: Closed with build 030129
901: Closed with build 030205
902: Closed with build 030212
903: Closed with build 030219
904: Closed with build 030226
905: Closed with build 030305
906: Closed with build 030312
Except for PR's with priorities ending in 00 or 50, major PR's are sorted in the approximate order they will be worked on. PR's ending in 00 or 50 have been placed in a general category, but haven't yet been assessed for when they will be worked on. Of course, PR's with low level of effort can be done anytime, regardless of priority.
A priority of 0 indicates that the PR hasn't been evaluated for a priority yet.
PR titles often begin with a brief notation about level of effort in units of d (days), w (weeks) or m (months).
Priorities in the 900's are thought to be closed and associated with a particular build.
To generate a useful report containing titles and descriptions from active PR's, go to "Generate PR System Reports/Active PR's" on the PR system page.
Link to PR System.
Link to other PR's of interest to the Orbit Planner.