My action item from the visit planner meeting: g.. [[Rusty is going to check out the current SEA's visit planner (this is a different thing from VOLT)]] I've looked into the Visit Planner that is in SEA 5.0. The Visit Planner allows you to define visits, define simple constraints on visits (e.g. visit#2 must start at least 1 day after visit#1), drag visits along a timeline, and specify that a visit requires CVZ. Double-clicking on a visit brings up the orbit planner tool. A button to Schedule Visits exists on the toolbar but the function is not implemented. I could not get the GUI to display more than 0.1 day at a time and while I could zoom in on the timeline I could not figure out how to zoom out. I also could not seem to affect the length of a visit. Since I have had a lot of trouble getting SEA to run properly on my system I'm not sure if the behavior I'm seeing is related to the state of the tool or my environment but I suspect that the SEA Visit Planner is mostly a mock-up. Rusty