REQUIREMENTS FOR BRIGHT OBJECT CHECKING IN THE VTT
--------------------------------------------------
Requirement To Be Met by 12/31/00
-----------
Field stars checked for health and safety concerns yes
Field stars checked for various science concerns yes
Printable version of results available yes
Display batch mode results to be displayed in VTT yes
Do not process duplicate configurations yes
This applies to batch mode processing.
Read Phase 2 Information not directly
Must be manually supplied
Display color coded marks in VTT indicating concerns no
stars will be marked, but details will be available textually
The VTT should have line to mark area checked no
Only inscribed/circumscribed circles if no orient no
Be able to display results w/o DSS image no
PI AND CONTACT SCIENTIST BRIGHT OBJECT TOOLS -------------------------------------------- o Separate from VTT o Run similar to VTT Batch Retriever o PI Tool Input from File o CS Tool Input from Assist Databases o Output o Summary File: Record for Each Exposure o Observation Parameters o Counts of Alerts o Alert File: One for Each Exposure o Record for Each GS2 Object o RA, DEC, V, V-R, alerts
VTT Bright Object Behavior
--------------------------
o VTT Aperture Based
o Bright Object Checking Run from a Dialog Box
+--------------------------------------+
| +-------------------------+ |
| | List of Exposure Modes | |
| | | |
| | | |
| | | |
| +-------------------------+ |
| Spectral Element: _______________ |
| Exposure Time : _______________ |
| |
| Add Change Remove |
| |
| Okay Apply |
+--------------------------------------+
o Switching Apertures Switches Out Dialog Box
o Results
o Objects with Concern Displayable Through
VTT Catalog Overlay Facility
o Details for Each Object Displayable in Text Box
and Saveable to a File
Plan
----
o FTE Cost
o Engine 4 weeks
o PI Tool 4 weeks
o CS Tool 4 weeks
o VTT Support 14 weeks
--
26 weeks
o Mike Nominally Available until 12/31 (21 weeks)
o CS Tool Deferred